Water Treatment Plant Fabricator (Bibra Lake)

Water Treatment Plant Fabricator (Bibra Lake)

29 Nov
|
Western Water Solutions
|
Bibra Lake

29 Nov

Western Water Solutions

Bibra Lake

Western Water Solutions is looking for an experienced fabricator to build and assemble water treatment plants at our Bibra Lake workshop. Extensive hands-on experience with Schedule 40/80 uPVC pipework and installing mechanical or process equipment is essential.

We design and build reverse osmosis plants, filtration systems, chemical dosing skids and packaged water treatment plants for healthcare, industrial and commercial clients across WA.

What you’ll do

- Measure, cut, dry-fit and solvent-weld Schedule 40/80 uPVC pressure pipework.

- Fabricate and assemble pipework, manifolds and valve assemblies from P&IDs; and fabrication drawings.

- Set out, mount and align pumps, filter housings, membrane vessels, tanks and instrumentation.

- Install pipe supports and brackets, allowing for service access and avoiding strain on equipment connections.

- Assist with pressure testing, leak checks and factory acceptance testing before dispatch.

- Work with our engineering and workshop teams to resolve fit-up issues during assembly.

- Site installation.

- Assist the WWS engineering team with FAT & SAT processes.

What you’ll bring

- Extensive practical experience with Schedule 40/80 uPVC pressure pipework (must have).





- Demonstrated experience installing mechanical or process equipment on skids, frames or packaged plants.

- The ability to read fabrication drawings and work independently from set-out through to final assembly.

- Clean, accurate workmanship and attention to pipe alignment, supports and service access.

Experience building water treatment plants, reverse osmosis systems or industrial process skids will be highly regarded.

What we offer

- $80,000–$110,000 per year, depending on experience.

- Performance bonuses that recognise your contribution.

- Tools of the trade provided for workshop fabrication and assembly.

- A supportive team setting alongside experienced fabricators, engineers and technicians.

- Opportunities to progress your career as Western Water Solutions grows, with scope to take on more complex builds and greater responsibility.

- Access to coaching and other support services through the WWS Employee Assistance Program.

How to apply

Send us your résumé and a short summary of the uPVC pipe sizes you’ve worked with, the equipment you’ve installed and a plant or skid you’ve helped build. Please include your earliest available start date.

📌 Water Treatment Plant Fabricator (Bibra Lake)
🏢 Western Water Solutions
📍 Bibra Lake

Reply to this offer

Impress this employer describing Your skills and abilities, fill out the form below and leave Your personal touch in the presentation letter.

Subscribe to this job alert:

Get the latest job offers by email for: water treatment plant fabricator (bibra lake) / bibra lake

Subscribe to this job alert:

Get the latest job offers by email for: water treatment plant fabricator (bibra lake) / bibra lake