24 Nov
|
Navartis
|
Sydney
About the Role
We're working with a major main contractor delivering a large-scale hyperscale data centre campus, and are seeking an experienced Services Manager to lead the coordination, integration, and commissioning of all MEP and critical systems through to handover.
This is a senior technical leadership role suited to someone who has grown through electrical, mechanical, commissioning, or MEP coordination disciplines and is ready to own the full services scope on a major mission-critical build.
Scope & Responsibilities
Coordinate all services trades - electrical, HVAC, fire protection, controls, communications, and commissioning teams, ensuring systems integrate correctly both physically and operationally
Manage critical power infrastructure: switchboards, transformers, generators, UPS systems, battery rooms, busways, and redundant power feeds
Oversee cooling and thermal management, including chillers, cooling towers, containment systems, pipework, and airflow balancing
Lead BIM-driven coordination: clash detection, coordinated services drawings, and sequencing reviews
Own testing and commissioning delivery,
including integrated systems testing, generator load testing, UPS failover testing, black building tests, and thermal testing
Act as the technical authority ensuring all critical systems are designed, installed, integrated, and tested to operate continuously without failure
Candidate Profile
Background in electrical engineering, mechanical engineering, commissioning engineering, project engineering, or MEP coordination
Proven experience delivering MEP/critical systems on large-scale, mission-critical, or hyperscale data centre projects
Robust working knowledge of BIM coordination and commissioning methodologies (ATP/IST)
Comfortable managing multiple trade contractors and vendors on a rapid-paced, high-complexity build
Campus-scale or multi-building project experience preferred
Location
Open to candidates based in or willing to relocate from the UK, Ireland, Canada, Current Zealand, or Singapore. Visa/relocation support available
J-18808-Ljbffr
📌 Services Manager Data Centre Construction Sydney
🏢 Navartis
📍 Sydney