20 Nov
|
Catalyst Metals
|
Australia
20 Nov
Catalyst Metals
Australia
Catalyst Metals Limited operates the Plutonic Gold Mine in WA and is growing its underground operation. The Scheduling Engineer will lead the Monthly 3MS planning within the Technical Services team, ensuring secure, practical and production-aligned schedules.
The role emphasizes collaboration with Geology, Underground Operations, and Maintenance to translate plans into execution. You’ll report to the Senior Planning Engineer and support a FIFO roster with evolving rosters as the site expands,
#J-18808-Ljbffr
📌 Underground Mining Scheduler (Australia)
🏢 Catalyst Metals
📍 Australia