14 Nov
|
Webuild
|
New South Wales
14 Nov
Webuild
New South Wales
Lead and manage a multidisciplinary engineering team comprising Technical Office, Design Engineers and Design Consultants, while coordinating all site-based technical services, including Technical Office, Survey, Laboratory and Geology functions. Interface with Construction Phase Support teams to manage post-IFC design modifications, RFI, technical queries, non-conformance reports (NCRs) and construction-related engineering challenges. Ensure the timely development and implementation of practical engineering solutions, maintaining compliance with project requirements, design intent, safety standards and delivery objectives.
Qualifications:
- Tertiary Qualifications or related discipline such as a bachelor’s degree in civil engineering
- White Card
- Chartered Engineer is a plus
Experience:
- 10 years of experience in the design and construction of civil projects (tunnel, hydroelectric, bridge, roads.
- Minimum 10 year of experience working in the construction industry
- Ability to manage and give technical support to a team of technical office engineers
- Ability to work well under pressure
- Solid written, verbal and communication and presentation skills
- Relevant Technical knowledge in civil works (tunnels, roads, hydroelectric plant, concrete structure)
- Competent in the use of AutoCAD 2D to read drawings and the Microsoft office suite
Core Accountabilities and Responsibilities:
- Coordinate, in conjunction with the respective functional managers, the Area laboratory Manager, Chief Surveyor, Lead Geologist and Temporary Works Manager.
- Assure that all deliverables (WPA, CMS, SOW, MAR, ASBUILT) are prepared correctly and on time
- Support the design team in the design review to assure feasibility of construction and suggest optimization (value engineering)
- Assure all TW (temporary works) are prepared correctly and on time in accordance with company procedure
- Collaborate with other departments. (quality, construction, planning, environmental, project control) to solve technical issues that arise.
- Collaborate with Qty dpt. to solve NCR
- Participate to HAZOP, Safety in Design, Chair 2 and Chair 3 to support the design process
- Prepare a Monthly Report with the progress activities of the technical office for internal review and for the project control department.
- Manage Design/Field Change Request Post-IFC
- Assure preparation of Shop-Drawing on time
- Preparation of As-built
- Assure permanent Materials are ordered on time
📌 Chief -Technical Office (New South Wales)
🏢 Webuild
📍 New South Wales