13 Nov
|
ACCIONA Energía
|
Colac
13 Nov
ACCIONA Energía
Colac
About the Role
Permanent job opportunities exist for trade-qualified A Grade Electricians to join our tight-knit team at the Mt Gellibrand Windfarm (near Colac). As an ACCIONA Energia Turbine Technician, you’ll be working across 44 turbines that generate up to 132 MW of clean, renewable energy—keeping them running safely and efficiently.
- Maintenance – Routine and emergency maintenance on wind turbines, HV systems, and site infrastructure.
- Troubleshooting & Repairs – Fault finding and fixing issues to reduce downtime.
- Safety First – Follow all safety procedures and help build a solid safety culture.
- Teamwork – Work closely with your crew and contribute to continuous improvement.
Roster: Monday: 7 am – 3.30pm, Tuesday to Friday: 7 AM - 3 PM. You will be part of a 1:3 callout roster (daytime only unless it’s a substation emergency).
About You
You don’t need experience from the wind sector, but it’s great if you do! The main thing is that you are passionate about being part of the future of the wind industry and focused on having a brilliant career within it. Here’s what you should have as a minimum:-
- Hold a valid A Grade Electrical License
- Hands-on relevant experience in industry (wind, manufacturing, power, mining, oil & gas etc.)
- Enjoy working closely with a qualified trade partner, supporting each other to get the job done safely and efficiently
- Well-developed interpersonal skills and a collaborative approach to teamwork
- Demonstrate basic computer skills and familiarity with the Microsoft Office suite
- Maintain a current driver's license and live under an hour’s commute from site
- Ability to maintain qualifications relevant to the industry, including: First Aid Level 2, Working at Heights and Operator under ACCIONA Energy Work Permitting system.
- In compliance with Security of Critical Infrastructure (SOCI) Act 2018, this role is defined as critical worker and labelled at ACCIONA Energia as a Privileged Access Worker (PAW). Privileged Access Workers (PAW's) are required to obtain satisfactory results from Acciona's Suitability Assessment prior to commencement, this forms part of our standard pre-employment checks.
About Us
ACCIONA Energía is the world’s largest 100% renewable energy company.
The Mt Gellibrand Wind Farm, near Colac in Victoria, is one among many of ACCIONA Energía’s wind farms in Australia, was completed in late 2018. This wind farm generates 132 MW of clean energy, which is enough to power 90,000 homes.
ACCIONA Energía has installed more than 8,700 MW of our own wind power globally, which generates approximately 80 % of our renewable production to fight global warming.
As a company that values diversity as a source of talent, we work to foster an inclusive environment that promotes respect, belonging and engagement so that all people can participate on an equal opportunity basis. We invite everyone to apply regardless of origin, circumstances, background or condition.
📌 Wind Turbine Technician (Electrical) (Colac)
🏢 ACCIONA Energía
📍 Colac