08 Nov
|
Grano West
|
Perth
- Read and interpret structural plans
- Set out lines, levels and reference points
- Construct and install timber and modular formwork for detailed slabs, steps, split levels and retaining walls
- Erect heavy bracing systems to support concrete loads during pours
- Check all shutters and forms for alignment and structural integrity before concrete arrives
- Safely strip, clean and maintain formwork systems post pour
📌 Forkwork Carpenter (Perth)
🏢 Grano West
📍 Perth