02 Nov
|
Ferrovial Services Australia
|
Sydney
02 Nov
Ferrovial Services Australia
Sydney
The North Tarrant Express (NTE) was the first design-build-finance-operate-maintain managed lanes project in Texas and consisted of the complete reconstruction of 13.3 miles of the existing I-820/SH-183 corridor between Dallas and Fort Worth. Since opening in October 2014, nine months ahead of the contracted completion date, the general highway lanes are experiencing a 70% decrease in congestion time and a 15% increase in average speed. This Cintra-led project has doubled capacity and significantly improved mobility along this heavily congested corridor that traverses the heart of six cities through Northeast Tarrant County.
The North Tarrant Express 35W (NTE 35W) project spans 16.8 miles from I-30 in downtown Fort Worth to Eagle Parkway at the north end of Alliance Airport. The project is operated and maintained by the Cintra-led consortium in North Texas. This project has improved mobility by adding additional road capacity through a combination of general highway lanes and continuous frontage roads, along with tolled express lanes that use variable pricing to keep traffic moving.
The LBJ Express (LBJ) is currently the largest P3 operation in Texas and one of the largest ever undertaken in the U.
S. It is a regionally-significant transportation improvement project in North Texas that is relieving severe congestion in the dense urban area of north Dallas. In 2009, the Cintra-led consortium was selected to complete the design, construction, finance, operation, and maintenance of the project along I-635 and I-35E. Since opening in September 2015, the general highway lanes are realizing a 60% decrease in congestion time and a 10% increase in average speed.
What makes us different?
Our people come first. We want every single employee to develop both professionally and personally.
With a robust focus on growth potential, we look to our internal employees as potential candidates for both national and international opportunities. We aim to achieve greatness by promoting from within every chance we get. We work hard and play hard and strive every day for success and achievement. With a diverse group of professionals working in a fast-paced environment, we achieve milestones constantly. And if that weren’t enough, we also offer our employees highly competitive insurance benefits, Paid Time Off, and a matching 401(k) program.
Who is NTE, NTE 35W, and LBJ?
The North Tarrant Express (NTE) was the first design-build-finance-operate-maintain managed lanes project in Texas and consisted of the complete reconstruction of 13.3 miles of the existing I-820/SH-183 corridor between Dallas and Fort Worth. Since opening in October 2014, nine months ahead of the contracted completion date, the general highway lanes are experiencing a 70% decrease in congestion time and a 15% increase in average speed. This Cintra-led project has doubled capacity and significantly improved mobility along this heavily congested corridor that traverses the heart of six cities through Northeast Tarrant County.
The North Tarrant Express 35W (NTE 35W) project spans 16.8 miles from I-30 in downtown Fort Worth to Eagle Parkway at the north end of Alliance Airport.
The project is operated and maintained by the Cintra-led consortium in North Texas. This project has improved mobility by adding additional road capacity through a combination of general highway lanes and continuous frontage roads, along with tolled express lanes that use variable pricing to keep traffic moving.
The LBJ Express (LBJ) is currently the largest P3 operation in Texas and one of the largest ever undertaken in the U.
S. It is a regionally-significant transportation improvement project in North Texas that is relieving severe congestion in the dense urban area of north Dallas. In 2009, the Cintra-led consortium was selected to complete the design, construction, finance, operation, and maintenance of the project along I-635 and I-35E. Since opening in September 2015, the general highway lanes are realizing a 60% decrease in congestion time and a 10% increase in average speed.
Job Description
About the Role
The role reports to the Chief Executive Officer (CEO), who holds enterprise architecture and IT systems accountability. It works in close, ongoing coordination with two peer functions:
- Chief Information Officer (CIO) — who holds enterprise architecture and IT systems accountability.
- Chief Operating Officer (COO) — receives regular reporting on roadmap, program status, supplier performance and technology risk in a review chaired by the CIO with the COO participating; disputed root cause and sequencing decisions escape to a joint CIO
- and COO-chaired review; unresolved disputes between this role and Field Systems escape to the COO for direct resolution.
- Field Systems Director — shares a joint technical acceptance gate: no system transfers into operation without both signa
📌 Senior Infrastructure Technology Director (Sydney)
🏢 Ferrovial Services Australia
📍 Sydney