01 Oct
|
Clough
|
New South Wales
01 Oct
Clough
New South Wales
Job Description
n
The
Future Generation Joint Venture
brings together the combined engineering experience and expertise of WeBuild, Clough and Lane and has been selected to design construct
Snowy 2.0
. This project is based within the Snowy Mountains in NSW and will deliver one of the largest pumped hydro schemes in the world.
n
Snowy 2.0 is the next chapter in the Snowy Scheme's history. It is the largest committed renewable energy project in Australia and will provide on-demand energy and large-scale storage for many generations to come. This Iconic Project has and will continue to create its own legacy in Australian history.
Purpose of the Role: n
Responsible for the management and implementation of a section of works on a construction project to ensure time, cost, quality, safety and contractual targets are achieved. Responsible to develop and implement procedures to achieve quality, safety, timely production and compliance with budgets.
Qualifications: n
n
Tertiary Qualifications in Civil Engineering or similar discipline
n
White Card
n
C Class Driver's License
n
Experience: n
n
Minimum 2 years' experience working in the Construction Industry in a similar role
n
Experience working on large scale construction projects or other suitable projects works
n
Demonstrate initiative and creative problem-solving skills
n
Self motivated.
n
Ability to implement and follow through on multiple issues and to achieve productive results
n
Sound interpersonal skills
n
Ability to work collaboratively
n
Ability to work to deadlines and targets and can prioritise tasks under pressure
n
Good organisational skills with exceptional attention to detail
n
The ability to work quickly, effectively and positively in a demanding environment
n
Strong analytical and problem-solving skills
n
Core Accountabilities and Responsibilities: n
n
Ensure the development, in collaboration with the Supervisors,
of a detailed programme for day to day activities, look ahead programme and daily program changes, including resources required and material deliveries;
n
Develop better ways to deliver the Project works, including improved construction methodologies, alternative designs and alternative materials selection;
n
Ensure data for shift reports is reviewed and opportunities identified, for improvement to methods and reoccurring issues/delays.
n
Monitor progress of the planned works and regularly review the delay allowance status;
n
Coordinate resources to ensure the Project works progress in conjunction with other Section works;
n
Ensure the tracking of off-site procurement items against programme;
n
Actively participate in the application of resources to generate a target program based on the method, with a target completion that precedes the contracted completion by a suitable delay allowance;
n
Communicate the program to all relevant internal parties;
n
n
Oversee the tracking of off-site procurement items against program
n
n
Develop "One Team" culture so that the site teams cooperate well with each other and integrate effectively with the wider project teams;
n
Coordinate and ensure that Graduate and Site Engineers are clear what is expected of them and provide regular feedback to ensure effective performance;
n
Lead development of Graduate and Site Engineers to ensure development of their capability by identifying and addressing development needs of direct team members;
n
Develop and maintain positive relationships with clients and external parties,
which are managed within the guidelines of the project code of ethics.
n
Seek, test, analyze and evaluate the latest blasting technologies and make the necessary recommendations prior to implementation to ensure viability.
n
Provide advice to relevant stakeholders on surface blasting practices to proactively alleviate or avoid any unnecessary problems and to always ensure statutory compliance.
n
Scrutinize, inspect and approve blast block designs to ensure safe blasting practices and conformance to set standards and design Drill Patterns
n
Monitor blasting activities, analyze results and submit recommendations to achieve the desired fragmentation.
n
Generate effective drill pattern, tie-in and charge designs.
n
Monitor and review data from drilling, explosive loading, and blasting to generate daily reports.
n
Produce Dip, Charge and Backfill sheets.
n
Refinement of drill and blast pattern designs based on short/medium term plans.
n
Ensure compliance with client policies, procedures and systems.
n
Maintain a positive and productive working culture.
n
n
The above listed authorities & responsibilities are only a guide and may change as directed by your Manager/Supervisor or as per the requirements of FGJV Management.
n
As an employee you will be eligible to participate in a number of
additional
employee perks
. This includes:
n
n
Employee Assistance Program (EAP)
n
Professional Development
n
n
The employment relationship will be governed by Australia or New Zealand Employment Law.
n
These positions are in remote challenging areas with extreme cold temperatures which need to be considered before applying for these roles.
n
Working with Clough provides you with access to challenging projects and career opportunities, along with access to professional development through our various internal and external training programs.
n
#J-*****-Ljbffr
📌 Engineer - Project (New South Wales)
🏢 Clough
📍 New South Wales