24 Sep
|
Mcconnell Dowell
|
Einasleigh
24 Sep
Mcconnell Dowell
Einasleigh
About The Project The Kidston Pumped Storage Hydro Project is a game-changing development for Australia’s clean energy future. Located in Far North Queensland, this world-first project is transforming a disused gold mine into a large-scale renewable energy storage facility.
Once complete, the project will deliver up to 250MW of rapid-response power to the National Electricity Market; enough to power over 100,000 homes. Backed by Genex Power and supported by ARENA, it represents a major step forward in sustainable infrastructure.
Key responsibilities of the role include but not limited to:
- Ensure compliance with endorsed procedures and Management Plans.
- Support to Construction and Engineering for the Project Completion activities.
- Identify non-compliances and instigate corrective actions as required.
- Establish Supplier/Subcontractor quality requirements and include in subcontract documents.
- Prepare and maintain the Project Audit Schedule in consultation with the Group Quality and Audit Managers.
- Carry out and report audits in accordance with the Project Audit Schedule.
- Establish and plan the controls for inspection and testing of construction works, materials and equipment onsite and offsite.
- Identify project hold and witness points and incorporate those into applicable ITPs.
- Assist in providing suitably qualified personnel to meet the inspection and test requirements nominated on the ITP.
- Monitor the use of ITPs, verification checklists and CEPs at regular intervals.
- Evaluate the inspection and test results.
- Ensure all inspection and test reports are submitted to the Principal’s Representative for review.
- Maintain the project non-conformance system.
- Ensure the site CMI Index is submitted for approval and the CMI is compiled progressively.
📌 Quality Manager (Einasleigh)
🏢 Mcconnell Dowell
📍 Einasleigh