16 Sep
|
SIMPEC
|
Australia
SIMPEC is seeking experienced E&I; Tube Fitters to join the McArthur River Mine Project. This role involves pneumatic valves, tubing installation, and instrument tubing within a busy mining construction workplace, on a FIFO roster.
Roster is 2 weeks on, 1 week off; project duration is approximately 3–4 months; point of hire is Darwin, with preference for candidates based in Darwin though applications from other locations are welcome.
J-18808-Ljbffr
📌 Darwin Based Fifo E&i Tube Fitter — Mine Project Borroloola (Australia)
🏢 SIMPEC
📍 Australia