Darwin-Based FIFO E&I Tube Fitter — Mine Project (Borroloola)

Darwin-Based FIFO E&I Tube Fitter — Mine Project (Borroloola)

15 Sep
|
SIMPEC
|
Borroloola

15 Sep

SIMPEC

Borroloola

SIMPEC is seeking experienced E&I; Tube Fitters to join the McArthur River Mine Project. This role involves pneumatic valves, tubing installation, and instrument tubing within a busy mining construction setting, on a FIFO roster.

Roster is 2 weeks on, 1 week off; project duration is approximately 3–4 months; point of hire is Darwin, with preference for candidates based in Darwin though applications from other locations are welcome.

#J-18808-Ljbffr

📌 Darwin-Based FIFO E&I Tube Fitter — Mine Project (Borroloola)
🏢 SIMPEC
📍 Borroloola

Reply to this offer

Impress this employer describing Your skills and abilities, fill out the form below and leave Your personal touch in the presentation letter.

Subscribe to this job alert:

Get the latest job offers by email for: darwin-based fifo e&i tube fitter — mine project (borroloola) / borroloola

Subscribe to this job alert:

Get the latest job offers by email for: darwin-based fifo e&i tube fitter — mine project (borroloola) / borroloola