14 Sep
|
Acciona
|
Wanneroo
ACCIONA is leading a flagship WA infrastructure project, with first production expected in 2028. Join a long-term, stable team on the Alkimos Desalination Plant Project, a multi-disciplinary site offering real career runway as works advance.
You will operate cranes, follow lift plans, coordinate with riggers, and ensure crane inspections before and after each shift, contributing to a secure, productive multi-trade work workplace on a major infrastructure site in Western Australia.
J-18808-Ljbffr
📌 Crane Operator 50 110t – Long Term Infra Project Wanneroo
🏢 Acciona
📍 Wanneroo