03 Sep
|
C2O Group
|
Kurri Kurri
03 Sep
C2O Group
Kurri Kurri
About Us:
At C2O Group, we deliver specialist engineering, commissioning, and operations support services across the energy, resources, and infrastructure sectors. With a robust track record across major Australian projects, we are committed to safety, quality, and operational excellence. Our team is agile, solutions-focused, and driven by building long-term partnerships with both clients and our people.
The Role:
We are seeking experienced Commissioning Plant Operators to join a high-performing team supporting the commissioning and start-up of a major gas-fired power station. This is a hands-on role requiring strong operational awareness, attention to detail, and the ability to work in a agile commissioning environment.
Key Responsibilities:
Support commissioning and start-up activities across Balance of Plant systems
Operate and monitor power station equipment from control panels and in the field
Implement LOTO and Permit to Work procedures
Assist with bringing generators online/offline, load sharing, and synchronization
Start and operate pumps, turbines, switchgear, transmission/distribution circuits,
and auxiliary systems
Conduct inspections, monitor alarms, and respond to abnormal system conditions
Assist in fault finding, diagnostics, and commissioning test activities
Record and report operational data, test results, and system performance
Identify and report equipment malfunctions or control issues
Follow commissioning procedures, safety protocols, and site requirements
Roster & Travel:
2:2 FIFO roster
Flights provided
Accommodation provided while on site
DIDO available for candidates located within commuting distance
Qualifications & Experience:
Degree in Mechanical Engineering or Trade Qualification (Fitter/Boilermaker)
Turbine Operator Ticket (highly regarded)
Experience in commissioning and/or gas-fired power generation preferred
Solid understanding of plant operations, control systems, and safety processes
Ability to work in a quick-paced, evolving commissioning environment
J-18808-Ljbffr
📌 Commissioning Plant Operator Kurri Kurri
🏢 C2O Group
📍 Kurri Kurri