21 Aug
|
c2o Group
|
Loxford
Job Description
About Us:
n
At C2O Group, we deliver specialist engineering, commissioning, and operations support services across the energy, resources, and infrastructure sectors. With a strong track record across major Australian projects, we are committed to safety, quality, and operational excellence. Our team is agile, solutions-focused, and driven by building long-term partnerships with both clients and our people.
n
The Role:
n
We are seeking experienced Commissioning Plant Operators to join a high-performing team supporting the commissioning and start-up of a major gas-fired power station. This is a hands-on role requiring strong operational awareness, attention to detail, and the ability to work in a dynamic commissioning environment.
n
Key Responsibilities:
n
n
- Support commissioning and start-up activities across Balance of Plant systems
n
- Operate and monitor power station equipment from control panels and in the field
n
- Implement LOTO and Permit to Work procedures
n
- Assist with bringing generators online/offline, load sharing, and synchronization
n
- Start and operate pumps, turbines, switchgear, transmission/distribution circuits,
and auxiliary systems
n
- Conduct inspections, monitor alarms, and respond to abnormal system conditions
n
- Assist in fault finding, diagnostics, and commissioning test activities
n
- Record and report operational data, test results, and system performance
n
- Identify and report equipment malfunctions or control issues
n
- Follow commissioning procedures, safety protocols, and site requirements
n
n
Roster & Travel:
n
n
- 2:2 FIFO roster
n
- Flights provided
n
- Accommodation provided while on site
n
- DIDO available for candidates located within commuting distance
n
n
Qualifications & Experience:
n
n
- Degree in Mechanical Engineering or Trade Qualification (Fitter/Boilermaker)
n
- Turbine Operator Ticket (highly regarded)
n
- Experience in commissioning and/or gas-fired power generation preferred
n
- Strong understanding of plant operations, control systems, and safety processes
n
- Ability to work in a rapid-paced, evolving commissioning environment
n
#J-18808-Ljbffr
📌 Commissioning Plant Operator (Loxford)
🏢 c2o Group
📍 Loxford