11 Aug
|
UGL
|
Wagga Wagga
UGL and CPB Contractors have been selected by Transgrid to deliver the ~140km western section of the HumeLink high voltage transmission project in NSW. The role is for experienced Substation Electricians to join the Maragle substation team, on a FIFO/DIDO roster based in Kunama, NSW.
You will install switchboards, control panels, switchgear, transformers and other equipment, read drawings, perform testing and ensure safety and project compliance.
#J-18808-Ljbffr
📌 Substation Electrician – FIFO/2:1 on Major HV Project (Wagga Wagga)
🏢 UGL
📍 Wagga Wagga