09 Aug
|
Ugl Pty
|
Australia
UGL Pty Limited, in partnership with CPB Contractors, is seeking experienced Substation Electricians for the HumeLink project in NSW. The role is FIFO/DIDO on a 2:1 roster, based at Kunama camp, with flights, accommodation and meals provided.
Responsibilities include installing switchboards, control panels, switchgear, cabling, earthing, transformers; reading drawings; testing cables; ensuring safety and quality; coordinating with engineers and management.
J-*-Ljbffr
📌 Substation Electrician – 500kv Hv, Fifo/dido Nsw Wagga Wagga (Australia)
🏢 Ugl Pty
📍 Australia