Linesperson – Cert III Transmission Overhead (Wagga Wagga)

Linesperson – Cert III Transmission Overhead (Wagga Wagga)

05 Aug
|
UGL CPB Humelink West
|
Wagga Wagga

05 Aug

UGL CPB Humelink West

Wagga Wagga

UGL and CPB Contractors have been selected by Transgrid to deliver the ~140km western section of the HumeLink high voltage electricity transmission project.

HumeLink is a current 500kV transmission project which will connect Wagga Wagga, Maragle and Bannaby in regional NSW that will significantly increase the capacity of the electricity network in Australia’s eastern states. HumeLink is one of Australia’s largest energy infrastructure projects, with about 365kms of proposed new transmission lines and a range of other new and upgraded infrastructure.

The HumeLink West scope of works, worth $1.4bn, includes delivery of new 500kV double circuit transmission lines spanning ~140kms from Wagga Wagga Substation to a new Substation at Gugaa, the Interface Point with HumeLink East near Gundagai and a new substation at Maragle in the Snowy Mountains for future connection to Snowy 2.0.

The Role:

We are seeking experiencedCert III Transmission Overhead Linespersons to join our a on a major infastructure project.

In this role, you will work as part of a established and high performing crew, contributing to the successful delivery of a critical transmission line across the HumeLink West project.

The role will be based inWagga Wagga, NSW on a FIFO basis. HumeLink West has multiple roster options available. All flights, meals and accommodation in brand new camps will be provided to you.

Your responsibilities will include:

- Climbing of transmission structures
- Upgrade and construction of new and existing assets
- Study and interpret technical drawings, network line diagrams and maps




- Liaise with Network Operator Inspectors and customers
- Complete comprehensive risk assessments
- Installing and maintaining conductors, aerial equipment, and underground cables
- Installing and maintaining all associated electrical supply equipment
- Attending to electrical breakdowns and emergencies.
- Adhering to site specific health and safety policies and procedures.

About you /Key Requirements:

- Trade Certification – Cert III ESI – Transmission Overhead (UET30521) or equivalent
- Demonstrated working on Overhead Transmission Line projects
- Construction Whitecard
- High Risk Work Licenses: Rigging, Dogging, EWP and Working at Heights
- Tower Rescue
- Any additional HRWL applicable to the role
- Ability to complete a pre employment medical

We are an Equal Opportunity Employer. We support women in construction, Indigenous advancement and participation and encourage people of all cultural backgrounds to apply.

We’re always looking for ways to make UGL and CPB Contractors a more rewarding place to work and offer a unique set of benefits, including:

- A rewarding career where we support your development, training and promote from within.
- Opportunities across all construction sectors so that there is always an opportunity suitable for the next stage in your career.
- Competitive remuneration and excellent benefits including a health and wellbeing program, discount portal and company-funded salary continuance insurance.
- Flexible work arrangements and a culture that values diversity and innovation.

#J-18808-Ljbffr

📌 Linesperson – Cert III Transmission Overhead (Wagga Wagga)
🏢 UGL CPB Humelink West
📍 Wagga Wagga

Reply to this offer

Impress this employer describing Your skills and abilities, fill out the form below and leave Your personal touch in the presentation letter.

Subscribe to this job alert:

Get the latest job offers by email for: linesperson – cert iii transmission overhead (wagga wagga) / wagga wagga

Subscribe to this job alert:

Get the latest job offers by email for: linesperson – cert iii transmission overhead (wagga wagga) / wagga wagga