Panel Operator – Utilities (Karratha)

Panel Operator – Utilities (Karratha)

02 Aug
|
Perdaman Chemicals & Fertilisers (Operations
|
Karratha

02 Aug

Perdaman Chemicals & Fertilisers (Operations

Karratha

Position: Panel Operator – Utilities
Location: Karratha, Western Australia
Project: Project Ceres – Perdaman Urea Plant
Employment Type: Full-time, Permanent | Rotating Shifts
________________________________________
Summary
The Panel Operator – Utilities is responsible for the safe, reliable, and effective operation of utility systems supporting the Ammonia & Urea Fertilizer Plant. This includes monitoring and controlling equipment such as gas turbines, steam turbines, HRSGs, ASUs, cooling systems, water treatment units, air and gas systems, fuel handling, effluent, and flare systems via DCS/PLC from the control room.
________________________________________
Education & Experience

- Diploma or associate degree in Mechanical, Chemical, or Power Engineering.
- 8–12 years in utility/power plant operations (preferably in fertilizer, petrochemical, or refinery).
- Experience with Siemens turbines and ammonia/urea plant utilities is preferred.

________________________________________
Skills & Knowledge

- Strong understanding of steam, power, air, water, and fuel systems.
- Proficiency in DCS/PLC (e.g., Yokogawa, Siemens).
- Knowledge of LOTO, HAZOP, confined space entry, and ESD systems.
- Ability to interpret P&IDs; and SOPs.




- Strong communication and coordination skills.

________________________________________
Working Conditions

- Shift work (day/night rotation), including weekends and holidays.
- Exposure to industrial environments (heat, noise, chemicals).
- Use of PPE and physical tasks such as valve operations required.

How to Apply:
For more details, connect with us at [email protected]

About Perdaman Chemicals and Fertilisers:
Perdaman Chemicals and Fertilisers, based in Western Australia, is developing Project Ceres, Australia’s largest and one of the world’s biggest urea plants, with a USD $4.5 billion investment and a capacity of 2.3 million metric tons per year. Located in Karratha, the plant will use feedstock from Woodside under a 20-year supply agreement and has a 20-year offtake agreement with Incitec Pivot. Urea is a safe, non-toxic fertiliser vital for boosting global agricultural productivity. The project will support the fertiliser supply chain, add value to Australian resources, and create around 2,000 jobs, including 200 permanent roles, boosting the local economy.

Job Type: Full-time

Work Location: In person

📌 Panel Operator – Utilities (Karratha)
🏢 Perdaman Chemicals & Fertilisers (Operations
📍 Karratha

Reply to this offer

Impress this employer describing Your skills and abilities, fill out the form below and leave Your personal touch in the presentation letter.

Subscribe to this job alert:

Get the latest job offers by email for: panel operator – utilities (karratha) / karratha

Subscribe to this job alert:

Get the latest job offers by email for: panel operator – utilities (karratha) / karratha